Flux FEED · end-to-end Flow

One operating layer from OPR to an issue-ready pack.

EPC Flux AI sits above the engineering tools your teams already use, turning owner requirements into process flows, room data, layouts, cited checks and budgetary cost on one shared project record.

Book a live walkthrough
FEED control plane / active
Project 04-218
01 / Project inputs
Drawings
Room data
Standards
02 / Flux modules
Flux Design
Flux Comply
Flux Material
03 / FEED outputs
Layouts
Evidence
Approval
24 sources indexed
13 workflows available
4 approvals pending
Fits the toolchain

Adds intelligence. Does not replace engineering systems.

01

Existing engineering tools

Revit, AutoCAD and the common data environment remain the systems where teams author and coordinate.

02

Modules on shared Flux Core

Design, Comply and Material power the FEED Flow. Bid and Source serve adjacent lifecycle jobs; detailed Estimate is on the roadmap.

03

Decision-ready delivery

DWG/DXF output, validation reports, structured BOM and revision evidence return to the project team.

Product architecture

One platform. Three layers.
Rule Packs for every sector.

Each capability has one home. Use a module independently, connect modules in a Bundle, or run a governed Flow to a complete engineering outcome.

03 · Flux Flows

Fixed fee per project

Flux FEED

One project record, change propagation and eight signed gates. Design + Comply + Material deliver an issue-ready FEED pack.

OPRURSPFDLayoutRoom BookComplyBOQFEED Pack

02 · Flux Modules

Bid · New

Flux Bid

Win the right projects and price scope correctly.

FEED

Flux Design

Room data to validated layouts.

FEED

Flux Comply

Prove the design is compliant, with citations.

FEED

Flux Material

What is needed, how much, roughly what it costs.

Procurement

Flux Source

Pick the right vendor and defend the choice.

Post-FEED · Roadmap

Flux Estimate

Bid-grade estimate for cost control.

01 · Flux Core · included with any module

Vault

Knowledge, search and standards

Data model

One shared project record

Connectors

Any drawing, BOQ or document

Audit trail

Sources, versions and approvals

Vault Enterprise · Premium · Cross-project knowledge, lessons learned, maintained standards and API access.

Flux Vault Knowledge Bank answering a GMP compliance question
Flux Vault · Knowledge Bank with cited answers
Flux FEED · end-to-end Flow

OPR to an issue-ready FEED pack. All in one place.

Flux Design, Flux Comply and Flux Material run on one project record across five phases and eight signed gates. Open GMP-critical findings block gate approval.

Flux Flow workspace showing all five FEED phases with the Phase 1 OPR worksheet open
Flux Flow · five phases, one project recordPhase 1 · Requirements & Process Design
Phase 01 · G1 · G2 · G3

Requirements & Process Design

The owner fills the OPR. Flux prefills the Design Basis, sends one confirmation list back and generates rule-checked PFDs for every product route.

Deliverables
OPRPrimary URSDesign BasisFrozen PFDEquipment register
Powered by
Flux DesignFlux Comply
Illustrative demo score91.1%
Flux FEED flow - Requirements & Process Design screen
5
phases
8
signed gates
3
modules in the Flow
1
issue-ready FEED pack
Flux Core · shared processing model

Five processing stages. One continuous engineering context.

Explore how information moves through FluxAI without losing its source, revision or accountable owner.

Stage 01

Read the project record

Drawings, room data, schedules, specifications and vendor documents enter one controlled project context.

Controlled output

Indexed project context

Inputs in context
P&ID - Rev C
Room data sheet
HVAC zoning
Client URS
Processing signalsLIVE
Drawing entities
Document hierarchy
Revision metadata
Technical architecture

Built as an operating layer, not another authoring silo.

Each layer has a clear responsibility. Existing engineering systems remain intact while FluxAI adds connected context, repeatable workflows and governed decisions.

Layer 05

Governance and approval

Roles, review gates, exceptions, revision history and final engineer sign-off.

RBACAuditApproval
Layer 04

Flux module engines

Bid, Design, Comply, Material and Source work independently or together. Detailed Estimate remains on the roadmap.

CreateAssureDecide
Layer 03

Orchestration

Sequences tools, rules and reviewers according to the project's controlled workflow.

RouteRetryEscalate
Layer 02

Flux Core

Vault, the shared project data model, connectors and audit trail underpin every module.

EntitiesRelationsRevisions
Layer 01

Engineering systems

Revit, AutoCAD, CDEs, spreadsheets and document stores remain the source environment.

CADCDEOffice
Flux FEED · shared data, controlled hand-offs

Every check follows the same governed path.

Flux AI reads the engineering files teams already produce, grounds each check in project and regulatory references, then returns a verdict an engineer can review.

01 · Structure

Flux Design · Room Book

Room data, requirements and project context

RoomsURSCriteriaRevisions
02 · Create

Flux Design · Layout

Engineering layouts and review-ready 3D views

LayoutsFlows3DReview
03 · Assure

Flux Comply

Regulatory and engineering requirements

ValidateCiteScoreRoute
04 · Quantify

Flux Material

BOM, quantities and Class 5-4 budgetary cost

BOMBOQRatesReport

Speed

Weeks of review compressed into hours

Quality

Consistent, traceable, clause-cited output

Cost

Fewer manual cycles and less downstream rework

Flux Comply

A verdict is only useful when the evidence travels with it.

Flux Comply exposes the rule, source and exception state so reviewers can inspect how each conclusion was reached.

42
checks
41
passed
01
review
Layout validation / CR-204
Cleanroom concept - Revision C
Review ready
Airflow direction
EU GMP Annex 1 - 4.12
Pass
Maintenance clearance
Project rule EQP-07
Review
Material flow crossover
URS - 6.4.3
Pass
Room classification
ISO 14644-1 - Table 1
Pass
Flux Comply drawing compliance checklist with pass rate and findings by severity

Flux Comply · regulatory compliance checklist · 58 checks - 20 rooms

Exception owner
Process engineering
Next gate
Lead engineer approval
Governance by design

Evidence an approver can inspect.

Project rules, internal standards and regulatory references are applied as one controlled checklist - without hiding the source or the decision path.

URS register showing 32 documents issued for approval and Primary URS flow-down traceability
URS register · Primary URS flow-down with clause traceability
Exact citations

Every finding links back to the source clause or project rule.

Pass · Warning · Fail

Clear verdicts focus review on exceptions instead of rereading everything.

Revision traceability

Changes propagate from the room data source with an inspectable history.

Engineer approval

Owners and EPC reviewers sign G1-G8; a gate stays blocked while a GMP-critical finding is open.

Compliance dossier export

Executive summary · Room Book vs drawings · Regulation vs design
Compliance report executive summary with checks breakdown and Room Book vs drawings findings
Part 1 - Room Book vs drawings
Compliance report Part 2 regulation vs design with area classification
Part 2 - Regulation vs design